Waterseal were appointed by Story Contracting as the specialist waterproofing contractor for the River Anker bridge works on the West Coast Main Line at Tamworth. The project involved installing a high-performance waterproofing solution to the existing underbridge structure during planned rail possession periods.
Working within tight blockade windows alongside wider civil and rail infrastructure activities, our team installed a robust waterproofing system beneath the bridge deck designed to protect the structure from water ingress, extend service life, and minimise future maintenance requirements.




